CV (Configuration Version) not yet delivered from node. To complete this document, following issues must beġ. HW in the RBS must be configured according to UTRAN P1 FCO UTRAN P1 SW package has been downloaded from The following conditions must apply, before this instruction canīe executed: The node must be installed and verified according to This document addresses only Ericsson Internal personnel with the same level ofĬonfiguration that the node should have had when leaving NPC To the status of initial configuration.I.E. To bring the node, that havebeen delivered with UM2 SW or no SW, up The purpose of this document is to describe the procedure on how 18ĬONFIGURATION.Ģ0USE WS FTP PRO TO DOWNLOAD THE SOFTWARE FROM TC TO RBS NODE. NODE.ġ5USE HYPER TERMINAL CONNECTION TO READ OUT IP CONFIGURATION OF THEġ8USE MS-DOS PROMPT TO CHECK IP CONNECTIVITY OF THE RBS NODE. TO COMPLETE THIS DOCUMENT, FOLLOWING ISSUES MUST BE RESOLVED. Revision without notice due to continued progress inmethodology,ĭesign, and manufacturing.Ericsson shall have no liability for anyĮrror or damages of any kind resulting from the use ofģPURPOSE. RBS Initial SW installation Instruction.Ericsson Radio SystemsĪB All Rights ReservedThe contents of this document are subject to
0 Comments
Leave a Reply. |